NZ Crane Group News
A 220t in the Tasman Sea?
|
The Project took 2 years of preparation, including a trial assembly/disassembly & test lift of the crane on shore. The operation took place in a 24/7 setting, where marginal weather conditions gave limited slots for safe lifting. 07th March 2011 |
